Wed, November 2, 2011
Tue, November 1, 2011
Mon, October 31, 2011
Fri, October 28, 2011
Thu, October 27, 2011
Wed, October 26, 2011
Tue, October 25, 2011
Mon, October 24, 2011
Sun, October 23, 2011
Sat, October 22, 2011
Fri, October 21, 2011
Thu, October 20, 2011
Wed, October 19, 2011
Tue, October 18, 2011
Mon, October 17, 2011
Sun, October 16, 2011
Fri, October 14, 2011
Thu, October 13, 2011
[ Thu, Oct 13th 2011 ]: Market Wire
Form 8.3 - [Investec Ltd]
Wed, October 12, 2011
Tue, October 11, 2011
Mon, October 10, 2011
Sun, October 9, 2011
Sat, October 8, 2011
Fri, October 7, 2011
Thu, October 6, 2011
Wed, October 5, 2011
Tue, October 4, 2011
Mon, October 3, 2011

Running Fox Brett Gold Project Phase One Drilling Complete

  Copy link into your clipboard //house-home.news-articles.net/content/2011/10/2 .. tt-gold-project-phase-one-drilling-complete.html
  Print publication without navigation Published in House and Home on by Market Wire
          🞛 This publication is a summary or evaluation of another publication

October 20, 2011 09:00 ET

Running Fox Brett Gold Project Phase One Drilling Complete

VANCOUVER, BC--(Marketwire - Oct 20, 2011) - Steven Schurman, P. Geol. (US), CEO, Director, reports:

Running Fox Resources (TSX-V: [ RUN ]) (PINKSHEETS: [ RFXRF ]) reports that it has completed the first phase of its drill program on the north portion of its high grade Brett Gold Project in southwestern BC. Assays from this first phase are pending.

The area has significant gold anomalies but until this program had not been drill tested.

The target was the continuation of shear zones that are contiguous to the south which have returned the following prior high grade gold intercepts (generally near surface):

DH 87-29 interval - 8.62 meters grading 25 grams per tonne gold;

DH 83-16 interval - 33.5 meters grading 2.53 grams per tonne gold;

DH 87-42 interval - 2.74 meters grading 33.94 grams per tonne gold;

DH 87-46 interval - 15.55 meters grading 2.53 grams per tonne gold;

DH 88-02 interval - 25.92 meters grading 1.68 grams per tonne gold;

DH 88-16 interval - 33.53 meters grading 2.53 grams per tonne gold;

DH 88-17 interval - 6.10 meters grading 15.82 grams per tonne gold;

DH 88-22 interval - 27.74 meters grading 2.88 grams per tonne gold;

DH 88-32 interval - 16.76 meters grading 4.66 grams per tonne gold;

DH 93-12 interval - 10.67 meters grading 3.87 grams per tonne gold;

DH 93-17 interval - 3.05 meters grading 56.16 grams per tonne gold;

DH 93-19 interval - 16.76 meters grading 35.79 grams per tonne gold;

DH 04-01 interval - 10.2 meters grading 5.28 grams per tonne gold;

DH 04-02 interval - 11.6 meters grading 10.39 grams per tonne gold.

Note: Source for all prior intercepts are 43-101 Technical Report, and Brett Gold Assessment Report available at [ www.foxgold.ca ] and on SEDAR.

Successful Bulk Sample:
Previous Silver and Gold Bulk Sample Processed by Teck Cominco in Canada, smelter receipts averaged 28 grams per tonne gold, plus 64 grams per tonne silver

See website 3D Geological drillhole movie, 3D Footwall, maps, geochem, and drilling.

On behalf of the Board of Directors: Steven Schurman, P. Geol (US), CEO, Director, and the named Qualified Person for the technical contents of this news release.
Running Fox Resource Corp. 604 725 8868 [ www.foxgold.ca ]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.