Sat, November 8, 2025
Fri, November 7, 2025
Thu, November 6, 2025

Bayside Shores Development Stalled as Martin County Planning Agency Rejects 1,200-Home Project

  Copy link into your clipboard //house-home.news-articles.net/content/2025/11/0 .. -planning-agency-rejects-1-200-home-project.html
  Print publication without navigation Published in House and Home on by Treasure Coast Newspapers
          🞛 This publication is a summary or evaluation of another publication 🞛 This publication contains editorial commentary or bias from the source

Martin County’s Planned 1,200‑Home Development Stalled Without Planning Agency Support

A sweeping new residential project that was poised to transform the Martin County shoreline has hit a significant roadblock, as the county’s local planning agency has declined to approve it. The proposed development, named “Bayside Shores,” was to be built on a 70‑acre parcel adjacent to the county’s popular fishing pier and would have included 1,200 homes, a commercial strip, and a public park. In a decision announced on Monday, the Martin County Planning and Zoning Commission voted 5‑2 against the proposal, citing a range of environmental, infrastructure, and regulatory concerns.

The Project’s Ambitious Vision

Bayside Shores was designed by the real‑estate development firm Greenhaven Properties, which has a track record of mixed‑income projects in the Sunshine State. According to the developer’s website, the plan would offer a blend of townhomes, condos, and single‑family residences, ranging from $250,000 to $600,000. In addition to housing, the development would feature a 20‑story high‑rise community center, a 4‑lane retail plaza with a grocery store and boutique shops, and a 5‑acre waterfront park complete with walking trails and a fishing dock.

The developer’s marketing materials highlight the project’s “eco‑friendly” features, including solar panels on every building, a rainwater harvesting system, and a “greenbelt” corridor intended to preserve native vegetation. Greenhaven also promised to contribute $1.5 million toward local infrastructure upgrades, such as a new water main and storm‑water detention system, to offset the development’s impact on the county’s aging infrastructure.

Planning Agency Concerns

The Martin County Planning and Zoning Commission’s decision came after a rigorous review process that included public hearings, environmental impact assessments, and consultations with the Florida Department of Environmental Protection (FDEP). The agency’s chief planner, Linda Torres, said the primary reasons for rejection were:

  1. Wetland Protection: The proposed site lies within a 45‑acre wetland corridor that serves as a critical habitat for several endangered species, including the loggerhead sea turtle. According to the FDEP’s review, the project would require the removal of 20% of the wetland area, a change that would not meet the state’s wetlands mitigation guidelines.

  2. Traffic Congestion: The projected traffic influx—an estimated 12,000 vehicles per day—would place a strain on County Road 70, the main thoroughfare that currently handles 8,500 vehicles. The county’s transportation planning office warned that the proposed road improvements would be insufficient to handle the increased volume.

  3. Infrastructure Capacity: Existing sewer lines and water mains would be inadequate for the additional demand. While Greenhaven promised infrastructure upgrades, the county’s engineering department found the plans lacking in detail and time‑line.

  4. Regulatory Compliance: The project’s zoning classification was originally “Residential – Multi‑Family” (RMF), but the developer requested a change to “Residential – Mixed‑Use” (RMU) to accommodate the commercial plaza. The commission determined that the zoning change did not comply with the county’s comprehensive plan, which reserves mixed‑use development for only the county’s central business district.

  5. Community Input: During the public hearing, over 200 residents voiced concerns about the loss of the natural shoreline, potential increase in property taxes, and the impact on local schools. The commission cited these community concerns as part of its decision.

Reactions from Stakeholders

Greenhaven Properties issued a statement condemning the decision as “unfair and short‑sighted.” “We have invested millions in securing environmental permits, and we have a proven track record of delivering mixed‑income housing that benefits the entire region,” the statement read. “The county’s refusal to support this project is a setback for Martin County’s long‑term growth and economic diversification.”

County Commissioner James Patel, who chaired the planning commission, said the decision was “the result of a thorough, evidence‑based process.” He added that the county remains open to future proposals that align with its comprehensive plan and environmental safeguards.

A local environmental advocacy group, “Friends of the Martin River,” applauded the decision. “The wetlands along the Martin River are a vital part of our ecosystem,” said group leader Maria Gomez. “The planning agency did the right thing in protecting these habitats for future generations.”

Next Steps

While the commission’s decision effectively stalls the Bayside Shores project, Greenhaven has not ruled out revising its proposal. The developer’s website indicates that they are currently exploring alternative sites that better meet the county’s environmental and infrastructure criteria. In the meantime, the county’s planning department will continue to evaluate other development proposals, emphasizing sustainability and community impact.

The Bayside Shores case underscores the complex balance Martin County faces between fostering economic growth through new housing and preserving the natural resources that make the region attractive. As the county moves forward, stakeholders will likely keep a close eye on how future projects navigate the stringent environmental and zoning regulations that have been put in place to protect the area’s unique ecological landscape.


Read the Full Treasure Coast Newspapers Article at:
[ https://www.tcpalm.com/story/news/local/martin-county/2025/11/07/huge-housing-project-fails-to-get-local-planning-agency-support/87118074007/ ]